1.Replanting / Replacement planting:
Sanctioned subsidy for Replantation/replacement planting shall be paid
in 3 installments for big gardens and two installments for small
holdings.
1a.Replanting:(Big gardens)
1st instalment | Immediately on completion of replanting and after receiving satisfactory 1st post planting inspection report . |
2nd instalment | On completion of one year after replanting and after receiving satisfactory 2nd post planting inspection report |
3rd instalment | On completion of 24 months after replanting and after receiving satisfactory 3rd post planting inspection report . |
1b.Replanting:(Small growers)
1st instalment | Immediately on completion of replanting and after receiving satisfactory 1st post planting inspection report . |
2nd instalment | On completion of one year after replanting and after receiving satisfactory2nd post planting inspection report. |
1c.Replacement planting:
Time of release of subsidy | Instalment No. | Minimum percentage of replaced area to be uprooted annually |
Immediately after Completion of planting | 1st | 20% |
12 months after completion of planting | 2nd | 30% |
24 months after completion of planting | 3rd | 50% |
Total | | 100% |
1d. To be eligible for 1st and subsequent installments of subsidy for
replacement planting, the applicant should have completed uprooting in
the prescribed minimum area against replacement planting.
1e. The entire sanctioned amount of subsidy should be
claimed within 7 (seven) years from the date of issuance of sanction
letter. Any amount remaining unpaid beyond the period of 7 years shall
not be eligible for disbursement and the case shall be treated as time
barred and closed.
-------------------------------------------------------------------------------------------------------------------------------------------
2.Rejuvenation pruning and consolidtion:
- Sanctioned subsidy amount shall be paid in 3 instalments for big gardens and in two installments for small holdings as under.:
(Big gardens)
1st installment | Immediately on
completion of rejuvenation pruning and infilling with or without inter
planting, as the case may be, and after receiving satisfactory
inspection report |
2nd installment | On completion of one year
after rejuvenation pruning and infilling with or without inter
planting, as the case may be, and after receiving satisfactory
inspection report |
3rd installment | On completion of 24 months after replanting and after receiving satisfactory inspection report |
(Small holdings)
1st installment | Immediately on
completion of rejuvenation pruning and infilling with or without inter
planting, as the case may be and after receiving satisfactory
inspection report . |
2nd installment | 12 months after completion
of rejuvenation pruning and infilling with or without inter planting,
as the case may be, subject to receiving satisfactory inspection report
. |
- The entire sanctioned subsidy amount should be claimed within 5
(five) years from the date of issuance of approval cum sanction letter.
Any amount remaining unpaid beyond the period of 5 years shall not be
eligible for disbursement and the case shall be treated as time barred
|